Ocean Grazer and the EIC Accelerator: A Battery Not Yet Built

30 September 20261,099 words6 min

Ocean Grazer, a spin-off from the University of Groningen, is developing a pumped hydro energy store that works without mountains: water is pumped between reservoirs to store renewable electricity and released through turbines to recover it. Originally conceived as an "Ocean Battery" on the seabed, it was selected in the EIC Accelerator's January 2023 cut-off and received an EU grant of €2.50 million for OCEANBATTERY, a €4.43 million project that ran from July 2023 to June 2025, according to CORDIS. The project's challenge, in the company's words, was "to demonstrate the technical and economic feasibility of underground PHS by demonstration in an sand excavation lake".

The project is closed, but CORDIS holds only its first periodic report, to June 2024. It says the design was reworked into "Ocean Battery 2.0", which can be installed inshore, near shore or offshore, growing the company's estimated European market from 15 GW to at least 200 GW, and that a digital twin and cost model were developed, according to the CORDIS reporting page. In March 2025 the company announced a site at Sellingerbeetse in Groningen for a 2.5 MWh pilot, part of RWE's OranjeWind project, and said it aimed "to start construction of the pilot in the second half of 2026", according to an archived copy of its website. Ocean Grazer B.V. was declared bankrupt by the court on 1 July 2025, the day after the project ended, and the bankruptcy was ended for lack of assets on 3 November 2026, according to the insolvency register record.

€2.50MEU grant
2.5 MWhPlanned pilot size
1 Jul 2025Declared bankrupt
0Demonstrators reported built

Company file

Legal entity
Ocean Grazer B.V., KvK 75974215, Groningen
Origin
University of Groningen; research started by Wout Prins in 2013
Product
AquaVault (formerly Ocean Battery)
Pilot
NEMO-I, Sellingerbeetse, 2.5 MWh (planned)
Partner programme
RWE OranjeWind
Insolvency
Bankrupt 1 July 2025; ended for lack of assets 3 November 2026
Website
Server error, September and November 2026
EIC funding
Grant first

Where Ocean Grazer Stands Now

Before the bankruptcy, the company had renamed its system AquaVault. The court declared Ocean Grazer B.V. bankrupt on 1 July 2025 and appointed a curator; the register shows the bankruptcy was ended on 3 November 2026 because of a lack of assets, according to the insolvency register record. NOS reported in August 2025 that the curator estimated debts at €3 million to €4 million, and that the director of the University of Groningen's holding company said parties had pledged €13 million for an €18 million pilot but the remaining €5 million could not be raised. In September 2026 the company's homepage and project page returned a WordPress "critical error", and the homepage returned a server error on 7 November 2026. Sources reviewed on 7 November 2026 do not show that pilot construction started, and CORDIS lists no final report.

The record

From ocean battery to bankruptcy before a pilot

Ocean Grazer's EIC project was to demonstrate its storage system in a sand-extraction lake. The project ended in June 2025 with no pilot reported built, and the company was declared bankrupt on 1 July 2025.

  1. 2013Research beginsUniversity of Groningen, wave energy
  2. Jan 2023EIC Accelerator cut-offOCEANBATTERYgrant first
  3. Jul 2023Project starts€2.50M EU grant
  4. Jun 2024First period endsRedesign for inshore use
  5. Mar 2025Pilot site chosenSellingerbeetse; 2.5 MWh; part of RWE OranjeWind
  6. Jun 2025Project endsNo final report published
  7. Jul 2025Declared bankruptCourt ruling, curator appointed
  8. Nov 2026Bankruptcy endedFor lack of assets

CORDIS, Ocean Grazer (archived website) and insolvency register record.

"The challenge of this project is to demonstrate the technical and economic feasibility of underground PHS by demonstration in an sand excavation lake."

Ocean Grazer, first periodic report to the EIC

The Technology: Pumped Hydro Without Mountains

Conventional pumped hydro stores energy by pumping water uphill and needs mountains. Ocean Grazer creates the height difference artificially with an underground reservoir, which it says gives pumped hydro's long life and near-unlimited cycles anywhere. The company says the system was successfully tested in Eemshaven and won a CES Best-of-Innovation award.

The market case

Europe's storage need by 2050, as cited by Ocean Grazer

The company says Europe needs 600 GW of storage by 2050, of which about 200 GW could come from mountain pumped hydro, leaving a 400 GW gap.

Ocean Grazer, first periodic report (CORDIS). Values in GW.

What the EIC Award Promised, and What the Record Shows

The project's own stated challenge was a demonstration in a sand-extraction lake. By its end in June 2025, the company had redesigned the system, modelled it and chosen a site, but no demonstrator had been reported built; construction was then scheduled for more than a year later, and the company was declared bankrupt the next day. Only the first-year report is public, so what happened in the second year cannot be checked.

  1. System redesignDeliveredOcean Battery 2.0.
  2. Digital twin and cost modelDeliveredPer first report.
  3. Lake demonstrationNot builtNone reported before bankruptcy.
  4. Final reportingNot publicOnly period 1 public.

The Money

The EU contribution was 56% of the project's total cost on CORDIS; how much of the grant was paid out is not public. Ocean Grazer's revenue and losses were not found in free sources, and the pilot financing described to NOS was not completed before the bankruptcy.

The pace

Storage added per year: current against needed

Ocean Grazer cites a current European deployment rate of about 1 GW a year, against 14 GW a year needed in the coming decade and 23 GW a year from 2030 to 2050.

Ocean Grazer, first periodic report (CORDIS). Values in GW a year.

The project budget

How the €4.43M project budget splits

The EU contribution was 56% of the OCEANBATTERY project's total cost; the rest is other project costs, not proof of company payments.

CORDIS, project 190140124. Values in € millions.

What Cannot Be Checked

Questions for the EIC

How much of the grant was paid out, why no final report has been published, whether the EIC accepted a project that ended without its demonstration, and what happened to the company's patents in the bankruptcy are not public.

Why Europe Should Care

The company's report cites a need for 600 GW of energy storage in Europe by 2050, against deployment of about 1 GW a year. Long-duration storage that works anywhere would help. But the EIC funded a demonstration, and the sources reviewed show none before the company's bankruptcy.

What the award promised

A demonstration of underground pumped hydro storage in a sand-extraction lake.

What the record shows

A new design, a chosen site, bankruptcy one day after the project ended, no public final report and a website returning errors.

The Verdict

Still on paper

Ocean Grazer's idea has evolved, but the physical proof the EIC paid for was not reported built when the project closed, and the company was declared bankrupt the next day. The bankruptcy was ended for lack of assets in November 2026.

Ocean Grazer and the EIC have not been asked for comment for this article. It is based entirely on public records and published statements, linked throughout.

Industry

EnergyEnergy storage

Focus
  • Mechanical storage
Technologies
  • Hydraulic engineering
Keywords
  • Long-duration storage
  • Pumped hydro
  • Grid storage
  • Offshore wind integration